DORA-based ROI calculator

What is slow, unreliable delivery costing you?

Move the sliders to your reality. See the annual value of closing the gap to high performance, in reclaimed engineering time, reduced failure cost, and faster delivery. Then email yourself the one-page summary.

Your team today

Fully loaded: salary plus employer taxes, benefits and overhead. Default reflects a mid-level Dutch engineer.

Roughly what share of your production deployments fail or need a rollback, hotfix or patch. A rough estimate is fine - if unsure, think about how often a release needs an unplanned follow-up fix.

Advanced assumptions (optional)

Revenue and productivity at risk during an outage. Left conservative on purpose; enterprise figures are far higher. Set to 0 to exclude downtime and count remediation labour only.

Enter a figure to see a return on investment and payback period.

Annual value unlocked
Conservative – Typical, per year
Engineering hours reclaimed / year
Freed capacity

Where the value comes from

  • Reclaimed engineering time
  • Reduced failure and incident cost
  • Faster delivery (opportunity, estimate)

Your DORA profile: today to target

Today → Target
Deployment frequency
Lead time for changes
Change failure rate
Time to restore service

Estimates based on DORA (2024) plus 2024-2026 industry research (Stripe, PagerDuty, Forrester, Nucleus) and typical Expeditious Software engagements. Not a guarantee of results. Each DORA metric is valued on its own and targets a realistic one-band improvement (up to Elite). We show a range from conservative to typical rather than a single number, because in practice not all of the possible value is captured.

Get the one-page summary

We will email you a branded PDF you can forward to your team and finance.

Want a grounded version of these numbers for your own systems? Book a call

Curious how these numbers are calculated? Read the methodology and the sources behind it.